| |
|
|
Technical Information
Polyroad Performance in the Field
State Highway SH20, Riverina Highway
- 22 Km West of Finley
Site Details:
- AADT = 1250
- Percentage heavy vehicles = 20%
- 20 Year ESAs = 4.25 X 106
- Constructed September 2000
- 200mm thick in situ stabilisation with PR11L @ 2% spread rate
- Conventional cutback bitumen seals
- Adjacent to Mulwala Irrigation Canal
Comments:
- Retained formation shape
- Less than 2mm wheel path rutting
- No shoulder deformation
- Uniform seal texture
For more information Contact Us
Back to Top |
Back to Case Studies
|
|