Polyroad operations

Polyroad logo

 

 

 
Home
Product Info
Technical Info
Projects
News
About Us
Contact Us
Site Map
 
 
 
Technical Info
 
 
> Polyroad Technical Overview
 
> Product & Performance Brochure
 
> Polyroad Lab Testing
 
> Polyroad Performance
>> Case Studies
 
> Dry Powdered Polymers (DPP)Specification
 
> AustStab Technical Note No 3
 
> ARPG Technical Note No 14
 
> GeoPave Technical Note 53
 
>Tampere University Finland Report
 

 

 


Technical Information

Polyroad Performance in the Field

State Highway SH20, Riverina Highway
- 22 Km West of Finley

State Highway SH20, Riverina Highway - 22 Km West of Finley - Click to enlarge (23KB)

 

State Highway SH20, Riverina Highway - 22 Km West of Finley - Click to enlarge (21KB)
Site Details:
  • AADT = 1250
  • Percentage heavy vehicles = 20%
  • 20 Year ESAs = 4.25 X 106
  • Constructed September 2000
  • 200mm thick in situ stabilisation with PR11L @ 2% spread rate
  • Conventional cutback bitumen seals
  • Adjacent to Mulwala Irrigation Canal
Comments:
  • Retained formation shape
  • Less than 2mm wheel path rutting
  • No shoulder deformation
  • Uniform seal texture

For more information Contact Us

Back to Top | Back to Case Studies

 

 

Copyright: Polymix Industries 2003-2010 | Privacy | Site Map | Contact Us |