| |
|
|
Technical Information
Polyroad Performance in the Field
State Highway SH17, Newell Highway
- 75Km North of Jerilderie
Site Details:
- AADT = 3300
- Percentage heavy vehicles = 51%
- 20 Year ESAs = 3.25 X 107
- Constructed September 1998
- 150mm thick in situ stabilisation with Polyroad PR21L @ 1.5% spread
rate
- Conventional cutback bitumen seals
Comments:
- Retained formation shape
- Wheel path rutting less than 2mm
- No shoulder deformation
- Uniform seal texture
For more information Contact Us
Back to Top |
Back to Case Studies
|
|