Polyroad operations

Polyroad logo

 

 

 
Home
Product Info
Technical Info
Projects
News
About Us
Contact Us
Site Map
 
 
 
Technical Info
 
 
> Polyroad Technical Overview
 
> Product & Performance Brochure
 
> Polyroad Lab Testing
 
> Polyroad Performance
>> Case Studies
 
> Dry Powdered Polymers (DPP)Specification
 
> AustStab Technical Note No 3
 
> ARPG Technical Note No 14
 
> GeoPave Technical Note 53
 
>Tampere University Finland Report
 

 

 


Technical Information

Polyroad Performance in the Field

State Highway, Main Road 57
- Temora Township

State Highway, Main Road 57 - Temora Township - Click to enlarge (11KB)     State Highway, Main Road 57 - Temora Township - Click to enlarge (13KB)
Site Details:
  • AADT = 1500 through traffic
  • Percentage heavy vehicles = 33%
  • 20 Year ESAs = 8.5 X 106
  • Constructed April 2000
  • 200mm thick in situ stabilisation with Polyroad PR21L @ 1.5% spread rate
  • Conventional cutback bitumen seals
Comments:
  • Retained formation shape
  • No wheel path rutting
  • No shoulder deformation
  • Uniform seal texture

For more information Contact Us

Back to Top | Back to Case Studies

 

 

Copyright: Polymix Industries 2003 | Privacy | Site Map | Contact Us |